Water Standard Drawings

East Valley Water District’s Water Standard Drawings can be downloaded following the links provided below. 

Drawing No. Plan Revision Date
  Water Standard Drawings - Complete Set April 2022
W-101A Water Service Installation 3/4" Thru 2" (D.I.P.) April 2022
W-101B Water Service Installation 3/4" Thru 2" (A.C. Pipe) April 2022
W-101C Water Service Installation 3/4" Thru 2" (D. & W. Pipe) April 2022
W-101D Water Service Installation 3/4" Thru 2" (C.M.L & C.) April 2022
W-102 Water Service Installation 3" And Larger April 2022
W-103A 4" Blow-Off Assembly For Mains 6" April 2022
W-103B 6" Blow-Off For Mains 12"-16" (Wet Barrel FH) April 2022
W-103C 6" Blow-Off For Mains 20"-36" Mains (Wet Barrel FH) April 2022
W-104 Typical Main Connection Details April 2022
W-105A 1" Combination Air & Vacuum Valve Assembly April 2022
W-105B 2" Combination Air & Vacuum Valve Assembly April 2022
W-105C 4" Combination Air & Vacuum Assembly April 2022
W-106 Horizontal Protection Zones For Sewer And Water April 2022
W-107 Vertical Protection Zones For Sewer And Water April 2022
W-108 Thrust Block Details April 2022
W-109 Double Detector Check Assembly (In-Line) April 2022
W-110 Low Profile D.D.C. Assembly (N-Shape) April 2022
W-111 Guard Posts Or Bollards April 2022
W-112 Fire Hydrant Installation April 2022
W-113 Class 150 - Bolt And Flange Table April 2022
W-114 Typical Installation Of Reduced Pressure Principle Backflow Prevention Assembly April 2022
W-115 Typical Waterline & Water Meter Layout April 2022
W-116 Standard Symbols & Linetypes April 2022
W-117 Service Manifold April 2022
W-118 Valve Stem Extension April 2022
W-119 Valve Box April 2022
W-120 Steel Casing For Water Pipe April 2022
W-121 Water Trench April 2022
W-122 Water Sample Station April 2022